RidgelineRIDGELINE / MATERIAL STUDY 05

From copper
to continuous.

Most leaks start at a joint.

01 / COPPER ROUTE
16POTENTIAL LEAK POINTS8 FITTINGS × 2
NOT FITTED
RidgelinePreparing the changeover

One illustrative route.

Five elbows, one coupler and two end adaptors become two P1 fittings on one continuous Ridgeline length.

16 → 4 potential leak points, counted as two connections per fitting. This is a comparison of this route, not a measured leak probability.

The travelling coil, building scale and teal water flow are artistic visualisations. Use current technical documents for sizing and installation.