Specifiers

From spec sheet to sign-off.

Suggested specification wording, full data sheets, WRAS and KIWA documentation, technical guides, RIBA-aligned CPD on stainless steel plumbing — everything needed to put Ridgeline confidently on a project pack.

316L marine-grade stainless WRAS approved KIWA Reg 4 certified RIBA-aligned CPD UK technical support

What specifiers get

A specification pack, a guide library, and a technical team that picks up the phone.

Ridgeline is built to be specified — not as a brand cameo on a drawing pack, but as a system the specifier can stand behind. Suggested wording, certification documentation, RIBA-aligned CPD, project review on demand.

  • Ridgeline Specification Pack

    System overview, suggested specification wording, proof documents and applications — in one PDF, ready to drop into a project pack.

  • Technical Guides library

    Drinking-water materials, ASHP pipework, 316L material science, WRAS / KIWA explained, plus a growing library of substantive guides indexed for both human and AI search.

  • CPD presentation, RIBA-aligned

    Available on request. In-person or remote, for practices, M&E consultancies and student cohorts. Built around the questions specifiers actually ask about stainless plumbing.

  • Project review with the technical team

    The UK technical team will walk through routing, sizing and certification on specific projects — before specification, during design review, or at the change-control stage.

  • Full certification documentation

    WRAS Product Approval Certificate, KIWA UK Regulation 4 (KUKreg4 ATS 3) Certificate, Flexis Pressure Declaration — all current versions in the technical downloads library.

  • Whole-home material consistency

    316L stainless steel water-contact surface from plant room to tap. One specification covers hot, cold, heating, ASHP and final connections — instead of three or four product families fighting each other in the same building.

For specifiers

Specification Pack, Technical Guides, CPD.

Three direct routes — the right entry point depends on where the project is in its lifecycle.

Ready to install at full speed?

Get hands on with Ridgeline, or speak to the technical team about the right route for your next project.